March 2008
|
|
15m long 2.5 tonne steel old beams removal from St. Peters Church, Coventry Job for Fosse Homes, Duotech slinger/banksman plus lift supervisor handle all aspects of lifting procedure. 50 tonne crane used to perform lift, at 32m boom length. One 2 leg chains, 10 tonne SWL used. Lifting sequence performed to method statement.
|
|
|
|
20th February 2008
|
|
Duotech lift supervisor plus slinger/banksmans for North Midlands Construction/MVM at Junction 26 M1 motorway Northbound. Unload and install 8x 70 Tonne 32m long road bearing beams for the 4 lane bridge widening project on the M1. Lifting procedure involved 2 Lanes of the M1 closed at 8pm – 5am, Nottingham Road Kimberley completely closed from 8pm – 5am. Spread of beams used to lift load, via rope slings used to lift load, shackles used to connect wire loop slings together plus 2 spread of beam. 500 tonne crane used with 165 tonnes counterweight. Radio’s used for signaling, lifting sequence completed over 2 nights to method statement.
|
|
|
|
18th February 2008
|
|
Duotech 30 Tonne crane 1 slinger/banksman plus 1 lift supervisor unloaded and installed a 1.2 tonne 3m squared hot delivery truck backed upto crane onto clients drive. 2 leg chains attached to load by slinger/banksman, load hoisted up and lifted over clients property and installed into position. According to pre-prepared method statement.
|
|
|
|
January 2008
|
|
Machine removal onto transportation contract lift for Field Associates Duotech Crane Hire use Duotech lift supervisor plus slinger/banksman to complete lifting sequence. First a small 8 tonne crane drives into building up to client’s 15 tonne load which is on skates. Chains are attached to load, 8 tonne crane then takes the weight of load which is then dragged to building entrance. At this point chains are detached, second crane is moved into position 4 leg chains are attached, load is lifted 2m into the air, transporter drives under load. Load is loaded into position, lifting sequence performed to method statement.
|
|
|
|
December 2007
|
|
Duotech crane hire performed a contract lift for Barratt Homes west midlands. JOB install roof trusses onto two plots, 2 packs of 5 trusses. Duotech 25 Tonne crane used, one two leg chains used 10tonne SWL. Duotech crane hire Slinger/banksman plus lift supervisor handled all aspects of the lifting procedure to method statement.
|
|
|
|
April 2008 - Wulfrum Building Services
|
|
25Tonne City Crane user to install 450kg Steel Framed Bay window into grade 2 listed building 2 leg chains plus 2 web slingers used to complete lift.
|
|
|
|
April 2008 - Green Villa Developments
|
|
Duotech Crane Hire supplied slinger/signaller plus crane supervisor to assist with the lift sequence and installation roof trusses over a 7 day period.
|
|
|
|
May 2008 - Blaxenden Chemical
|
|
Removal and installation of extractor fan. 35Tonne crane used 2 leg chains, endless slings assisted by Blaxenden Chemical staff.
|
|
|
|
June 2008 - Goodyear Wolerhampton
|
|
Removal of extractor fan and ducting/installation of new extractor fan and ducting, 25Tonne crane used 2 leg chain plus web slings.
|
|
|
|
July 2008 - King Smith Forge, Hackney, London
|
|
Duotech Crane Hire appointed person site surveyed prepared method statement and risk assessment. We also supplied the slinger/signaller to assist the crane driver of the mini unic crane with lift sequence and installation of 6 375kg balconies.
|
|
|
|
August 2008 - Klift
|
|
Duotech Crane Hire supplied Klift with a slinger/signaller to assist with the installation of roof sheet. Rugeley, Lichfield. Crane Used Klift mobile tower crane.
|
|
|
|
August 2008 - Coventry Road, Birmingham
|
Construction of new restaurant, 30tonne crane used to install concrete slabs. Dimension 2.5m x 1.3 x 0.5m plus 5m long steel beams. Ground condition poor, steel rigger mat’s used 2m x 1m square to support crane. 4x 2tonne shackles used plus 2 leg chains used Duotech Crane Hire slinger/signaller plus lift supervisor complete all lift sequences.
|
|
|